For Engineering, Construction, Architecture & Mining Services

Project-Heavy Industries—
Documentation-Ready Solutions.

We bridge the gap between messy project documents and your core systems. Automate tender extraction, drawing register metadata, and compliance logs—converting high-friction admin into billable engineering capacity.

Built for Queensland's Project-Heavy Firms

You're too big for consumer tools, too small for enterprise solutions. You're managing complex projects where high-volume documentation is a growth bottleneck. That's our sweet spot.

Ideal Firm Profile

Who We Work With

  • 15-200 technical staff (engineers, architects, project teams)
  • $5-100M annual revenue typical range
  • Project Management Integration: Data delivery via JSON, CSV, or Zapier
  • Capacity-constrained: Senior staff trapped in admin instead of design
  • Queensland-based: Brisbane, regional infrastructure, Bowen Basin

What We Automate

Common Pain Points

  • Tender specifications: Extracting requirements from large-scale tender packs
  • Drawing Metadata: Extracting schedules and revision data from CAD/Revit prints
  • Compliance logs: Digitizing site logs and extracting WHS incidents
  • Certification tracking: Subcontractor certificates, safety docs, and permits
  • Operational Data: Bridging field documentation into office-based systems
Built Environment AI Automation: Technical documentation bridge for Engineering, Architecture, Mining Services, and Property Management. From CAD exports and tender specs to structured project data with 90%+ accuracy.

Built Environment Industries
Engineering, Construction, Architecture & Mining

Total Addressable Market: 1,600+ Queensland firms
High fit—where The Protocol™ frees technical teams for higher-value work.

Civil Engineering & Construction

Key Pain Points: Tender extraction, subcontractor compliance, and SWMS management.

Typical Savings: 48 hours faster tender response; 15-20 hours/week on project admin.

Architecture

Key Pain Points: Drawing register metadata management and BIM schedule data extraction.

Typical Savings: 8-12 hours/week saved on drawing schedules and manual registers.

Mining Services

Key Pain Points: Safety incident digitization and maintenance log extraction.

Typical Savings: 10+ hours/week on regulatory safety and maintenance documentation.

Property Management

Key Pain Points: Lease document extraction and maintenance order matching.

Typical Savings: 12+ hours/week on lease administration and compliance tracking.

What These Industries Share

Different sectors, same challenges. Here's why The Protocol works across all of them:

Metadata Extraction

Proven Accuracy Targets

  • Validating 90%+ accuracy on complex technical text
  • Extracting metadata from CAD/Revit PDF exports
  • Human-in-the-loop review for field documentation
  • Bridge messy source docs to structured JSON/CSV

Real-Time Operations

Cloud-Based Processing

  • Cloud-based solution for real-time office/field sync
  • Seamless data hand-off via Zapier or API
  • Automated alerts for missing site documentation
  • Native integration with existing project management tools

Safety & Compliance Critical

WHS and Regulatory Requirements

  • WorkSafe Queensland compliance requirements
  • ISO 45001 safety management systems
  • Subcontractor certification and licensing tracking
  • Complete audit trails required for all projects

ROI Requirements

Need Proof First

  • Full Phase 4 implementations typically $50K+
  • Need validated ROI before board approval
  • Fixed budgets, not open-ended consulting
  • 3-9 month payback requirement typical

Ready to Validate Your Documents?

Don't guess—get the proof. We will validate 90%+ accuracy on 15 of your most complex documents in 48 hours. If we miss the target, you get a full refund. No open-ended consulting, just a fixed-price Feasibility Report.

Get the Feasibility Report — $1,500